• About Us
  • Password Resset
  • Cancellation and Return Policy
Thursday, May 15, 2025
The Executive Botswana
No Result
View All Result
  • Home
  • About Us
  • BPBA
  • News
    • News
    • Economy
    • Mining
    • Innovation
  • Feature
  • Subscribe
  • Contact
  • Home
  • About Us
  • BPBA
  • News
    • News
    • Economy
    • Mining
    • Innovation
  • Feature
  • Subscribe
  • Contact
No Result
View All Result
The Executive Botswana
No Result
View All Result
Home News

Shumba’s flagship power project on track for October 2025 completion

by
May 7, 2024
in News
0
Shumba’s flagship power project on track for October 2025 completion

•          Tsaone Segaetsho

Despite complexities such as the high cost of construction for Shumba Energy’s flagship Tati 100 MW Solar Project near Francistown, the energy firm has remained optimistic about meeting the October 2025 completion target.

Shumba Energy is a Botswana-based and owned coal and energy development company listed on both the Botswana Stock Exchange and the Stock Exchange of Mauritius (SEM).

“Despite the complexities involved, we maintain a cautiously optimistic outlook on achieving this critical milestone,” Shumba Energy directors informed investors on Monday.

According to the company, a significant step forward has been the selection of a tier one contractor as its preferred partner for the project, allowing them to now focus on finalising the capital investment requirements.

“Our current projections indicate that project completion is expected in quarter four of 2025, at which point we anticipate realising substantial value for the company,” the directors announced.

A progress which should hold hopes of shareholders on the Tati solar project is that it has also secured approval for water supply through a nearby pipeline, ensuring the availability of this essential resource during the construction phase.

Another significant announcement in the Tati Project is that it has been granted conditional membership by the Southern African Power Pool (SAPP) during the current quarter.

“This membership category is designed to support generators by confirming their participation in SAPP power markets once the projects become commercially operational. This development underscores the potential of our project and its future role in the regional power market,” said Shumba Energy’s Managing Director, Mashale Phumaphi.

Shumba Energy owns 80 percent of the Tati Solar PV Project and has so far spent P700,000 on site development, over P100,000 on legal fees and around P600,000 on other development costs, bringing the total expenditure on the project thus far to over P1.3 million.

Visits 453721
ShareTweetPin

Related Posts

KBL Champions Sporting Excellence at Botswana Sports Awards
News

KBL Champions Sporting Excellence at Botswana Sports Awards

April 13, 2025
Sharifa Noor: A New Era at Kgori Capital
Finance

Sharifa Noor: A New Era at Kgori Capital

December 13, 2024
Access Bank to acquire Stanchart assets in Botswana
Banking

Access Bank to acquire Stanchart assets in Botswana

December 11, 2024
Farmers hail vegetable import ban, bemoan retailers’ ‘sabotage’ pricing
Agriculture

Farmers hail vegetable import ban, bemoan retailers’ ‘sabotage’ pricing

November 21, 2024
BBS Bank Launches Business Account for Growth
Banking

BBS Bank Launches Business Account for Growth

November 21, 2024
De Beers, Anglo American leadership meet Boko
Diamonds

De Beers, Anglo American leadership meet Boko

November 15, 2024
Load More
Next Post
Predatory conduct found in medical aid sector

Predatory conduct found in medical aid sector

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Popular News

  • Choppies, PwC legal battle drags on

    Choppies, PwC legal battle drags on

    0 shares
    Share 0 Tweet 0
  • Paya to lead BTC after Masunga departure

    0 shares
    Share 0 Tweet 0
  • Total Energies ditches Botswana business

    0 shares
    Share 0 Tweet 0
  • Oasis Seeks To Dominate Botswana’s Bottled Water Market

    0 shares
    Share 0 Tweet 0
  • Bolokwe succeeds Tsheole as BSE Interim CEO

    0 shares
    Share 0 Tweet 0

By Categories

  • Agriculture
  • Banking
  • Contributed
  • Diamonds
  • Economy
  • Energy
  • Eonomy
  • Executive Interview
  • Feature
  • Finance
  • Innovation
  • Logistics
  • Mining
  • National
  • News
  • Oil and Gas
  • Opinion
  • Politics
  • Tourism
  • Transportation
  • Uncategorized

Published by PAWA CORPORATION (PTY) LTD.
The Executive is a product of PAWA CORPORATION (PTY) LTD, which reserves the right to the content herein. Unauthorised use or replication of the content herein is strictly prohibited in terms of the Copyright and Neighbouring Rights Act.

  • About Us
  • Password Resset
  • Cancellation and Return Policy

©The Executive Magazine | Powered by: Impeccable Tech & Designs.

No Result
View All Result
  • Home
  • About Us
  • BPBA
  • News
    • News
    • Economy
    • Mining
    • Innovation
  • Feature
  • Subscribe
  • Contact

©The Executive Magazine | Powered by: Impeccable Tech & Designs.

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Executive Botswana will use the information you provide on this form to be in touch with you and to provide updates and marketing.